My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4 76TH ST SW 2016-01-01 MF Import
>
Address Records
>
76TH ST SW
>
4
>
4 76TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 12:12:31 PM
Creation date
4/18/2017 12:12:24 PM
Metadata
Fields
Template:
Address Document
Street Name
76TH ST SW
Street Number
4
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Department <br /> Utilities Division,3200 Cedar Street <br /> ESTIMATE SHEET Everett,Washington 98201 <br /> (425)257.8800 <br /> Receipt # A����� Date Paid <br /> Cost of Work Order 3,046.00 Work Order # <br /> Cost of Service Order Service Order# <br /> Contact Person Telephone # _(360)659-6326 <br /> Requested By Gordon Witcher Date of Request 5.15-00 <br /> Property Owner(name) Atlantic- Pacific Corp <br /> Charge Cost to(name if different than owner) <br /> Address PO Box 5427 City Everett Zip 98206 <br /> Installation Location Rd 4i- <br /> Installation type/description/size/etc. #2—6" x 6" tap de final connection. Expose 6" in 76`", make tap <br /> 3 Install control valve and box. Trench and Install 6" x 8" Increaser and 20' (:t) 8" DI pipe. Make final <br /> connection after purity, restore excavation. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br /> restoration, and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 workine days in advance of required installation date to <br /> allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br /> administrative costs, We deficit shall be charged to the property for which such installation was made and the owner <br /> thereof,and provided further,that any excess payment shall be retur,ed to the person applying for the installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS3"AND LARGER MAYHAVEA SIX TO 10 WEEKLEAD TIME. <br /> e ._. <br /> cc: BI gPemut enter <br /> Material 1,170.00 Clair Olivers <br /> Tom Thetford <br /> Labor and Benefits 1,296.00 Kirk Brooks <br /> Gordon Witcher <br /> Equipment Rental 580.00 Robert Waddle <br /> TOTAL $3,046.00 Stan Mitchell <br /> Paul McKee <br /> Gerry Crum <br /> Alan Locke <br /> Prepared by: Gerry CrumG� ate Est. <br /> Accepted by: t <br /> epared: Representing: <br /> ESTIMATE GOOD FOR 6 MONTHS jyj <br /> ate. <br /> 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.