Laserfiche WebLink
evereff INSPECTION REPORT <br /> eAddress _�y — 77 <br /> Contractor N. <br /> Owner - rR IJA�)CN . <br /> Date _ /nom? -0 1 -Rq <br /> TYPE OF INSPECTION REQUESTED 2 <br /> ❑ BLDG: Pmt. No. I MECH: Pmt. No.c23 61 G _ <br /> ❑ ELEC: Pmt. No. PLBG: Pmt. No. <br /> ❑Temp.Elect. ❑Framin Gas Piping <br /> ❑ Footing ❑Drywall, Nailing Consultation <br /> ❑ Foundation ❑Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove O Rough-In ❑ Final <br /> ❑ Masonry ❑Service ❑ <br /> APPROVALO PARTIAL APPROVAL <br /> 1 VIOLATION CORRECTION REQUIRED <br /> ❑ Correct lops listed below MUST BE MADE before work can be approved. <br /> Please contact Inspector and arrange for appointment. <br /> Was not able to perform inspection. <br /> CALL 259-88 10 FOR REINSPECTION—24 hour notice required. <br /> A CERTIF AfZ`TE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> I <br /> Inspector Z Z <br /> Date Z <br />