My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1608 78TH PL SE LOT 7 2016-01-01 MF Import
>
Address Records
>
78TH PL SE
>
1608
>
LOT 7
>
1608 78TH PL SE LOT 7 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 1:43:10 PM
Creation date
4/18/2017 1:43:05 PM
Metadata
Fields
Template:
Address Document
Street Name
78TH PL SE
Street Number
1608
Tenant Name
LOT 7
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> F JLIC WORKS PERMIT COMMEN% <br /> 4. Connect side sewer per City Standard #601. <br /> Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. /Jv�" <br /> A rJl Connect rooftop downspouts to the drainage system provided for this lot. <br /> k��J--''8.. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide,2'deep and 25' long. See attachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as sill fence, straw <br /> bales, sweles, or erosion blankets. <br /> 11 Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on [his building lot. <br /> /i1 M No dirt,mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e.all unused driveways and nn <br /> broken or damaged area must be replaced). <br /> 18. Install a Type 1 concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front properly line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan #410 is required for the <br /> parking area. <br /> 22. If a sewer pump sydem Is to be Installed, the pressure line must discharge into a private manhole,then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system Is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> FOR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-7403/CL -F AT 425-339.7404 <br /> I' <br /> Pwcmmane <br /> f2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.