Laserfiche WebLink
INSPECTION REPORT <br /> Date:.,2 V/ -/a Permit: E <br /> Contractor: <br /> Owner: G!Gla.�C-- <br /> Site Address:_ �� L Ic? - � <br /> TPI'L cit INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Tomp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceding Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulale <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Drywall Nailing ❑Plumbing Final <br /> Ele�dralnsll <br /> ❑Shear Nailing GAS PIPE <br /> SITE ❑Root Nailing n Rough In/Service Hot Water Tank <br /> noting ❑Ceiling Grid [I Rningeration ❑ Rough In <br /> ❑Roof drains ❑Building Final )Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION. <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS <br /> ❑ OK FOR TC O. E] CORRECTION REQUESTED <br /> [� OK FOR C.O ❑ VIOLATION <br /> [] UNABLE TO PERFORM INSPECTION. <br /> I_I CALL(125)257.8881 FOR REINSPECTION•24 hour nolle required <br /> Inspe r: Date: I L_ <br /> EIR(0/08) �"�'^'��Y le M�%NrMMIrNNA rlf/rYrMO <br />