My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
117 79TH PL SE 2016-01-01 MF Import
>
Address Records
>
79TH PL SE
>
117
>
117 79TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 3:12:04 PM
Creation date
4/18/2017 3:11:47 PM
Metadata
Fields
Template:
Address Document
Street Name
79TH PL SE
Street Number
117
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIMIC WORKS <br /> December 11, 20N <br /> Brenda McLeod <br /> PO Box 1547 <br /> Everett WA 98206 <br /> Subject: Project: Everett Housing Authority <br /> Job Address: 117 79'h PI. SE <br /> Plan Check No: C0911-004 <br /> Dear Ms. McLeod: <br /> In response to your application for a construction permit. your plans have been examined and <br /> you are advised that the issuance of a permit is being %%ithheld for the reasons listed below. <br /> 'these comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Dire). All references refer to the <br /> (2006 International Building Code,) (2006 International Residential Code,) as amended by the <br /> State of Washington and/or Washington State Energy Code 2006 Edition, and adopted by the <br /> City of Everett, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necess:u} to provide <br /> (lie Building Division with two new complete sets of drawings reflecting the corrections <br /> requested. <br /> I. Provide Chapter 5 Washington State Energy Code (WSEC) component <br /> performance calculation for energy code compliance; specifically for the garage <br /> area that is [icing converted into living space (from previous letter Item k4). <br /> 2. Revise "Roof Framing Plan" and "Roof Plan" on Sheet A2.1 to show reduced <br /> overhang to meet maximum 18" overhang in the setback (there is no detail on <br /> Sheet 2 per your response letter dated November 27, 2009. <br /> 3. The insulation haflles shown on Sheets A4 and A4.1 do not show the insulation <br /> baffle requirements per Section 502.1.4.5. WESC (from previous letter N3). <br /> Please revise. <br /> 4. Exhaust fans and lights shall be switched separately. <br /> 5. Provide size and location of whole house fan. <br /> 6. Specify minimum 100 cfm exhaust fan in the kitchen. <br /> 7. The wall height in Detail 3 on Shcet A4.1 appears to be considerably less than the <br /> height of the same wall shown in the elevations; please clarify. Show how ceiling <br /> joist are supported. <br /> .1 <br /> v/ <br /> 4dLvn1nhvN W I 1 UN,\1111 rY M S1 1 / <br /> ENGINEERING I PUBLIC SERVICES DIVISION - 3200 Cedar Street•Everett,WA 98201 •(425)257-8800•Fax(425)257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.