Laserfiche WebLink
INSPECTION REPORT <br /> Date: p Perm i <br /> Contractor: <br /> Owner: <br /> Site A dress: //7 7 9 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service []LIFER ground .]Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork [j Fooling ❑Rough In ElRough In <br /> ❑Slab/Conduct ❑Foundation (_I Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to Insulate ❑OK to insulate <br /> ❑Service ❑Framing []Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑CedingGdd ❑ all Nailing ❑Plumbing Final <br /> ❑EleciNcat Final ,Shear Nailing GAS PIPE <br /> SITE WORK ❑R ,ling ❑Rough In/Servico _Hol Water Tank <br /> ❑Footing drains oiling Grid I]Refngemllon [.J Rough In <br /> ❑Roof drains LJ Building Final t]Gas Pipe Final ❑HWT Final <br /> OTHER O NSULTATION: <br /> F-t-APROVAL [] PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> [-] OK FOR T O ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C O ❑ VIOLATION <br /> ❑ UNABLE 10 PERFORM INSPECTION <br /> ❑ <br /> CALL(4225)257.8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: _ Date: <br /> Llh(4,09) iww Horn uw�.uwru caw <br />