Laserfiche WebLink
INSPECTION REPORT <br /> %47'r Date: LQ Permit: ( _6L 111 -067 <br /> Contractor: <br /> Owner: <br /> Site Address: <br /> TYPi:OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑9pundworldStab <br /> ❑Groundwork ❑Footing ❑Rough In %fat„Sough In <br /> ❑SlablCondud ❑Foundation ❑Ceiling Grid <br /> El Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Coding Grid ❑Drywall Nailing ❑Plumbing Final <br /> Cj Electrical Final ❑Sheat Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough InlService Hot Water Tank <br /> ]Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION, <br /> ❑ APPROVAL ❑ PA PROVAL FINAL APPROVAL THIS PERMIT <br /> (� OK FOR T.C.O. ORRECTION REQUESTED ❑ <br /> ❑ OK FOR C O. L] VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION <br /> ❑ CALL(125)2578881 FOR REINSPECTION.24 hour notice required <br /> le <br /> Inspector: Date:$ <br /> ?Gra'NAi�¢rr,..wrarsawmrcwa.uurar <br />