My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
205 79TH PL SE 2016-01-01 MF Import
>
Address Records
>
79TH PL SE
>
205
>
205 79TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 3:28:49 PM
Creation date
4/18/2017 3:28:42 PM
Metadata
Fields
Template:
Address Document
Street Name
79TH PL SE
Street Number
205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br /> ��JJ <br /> Date 1-9—U7 O3la <br /> Contractor: <br /> Owner: <br /> Site Address_ c>US <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING, <br /> ❑Temp Service ❑LIFER ground r�]G�r undwork/Slab EIGroundwurWSlab � <br /> C)Groundwork [.1 Facing .4-tGrp <br /> In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Underfloor ❑Roottop Units ❑Water Service <br /> ❑Grounding ❑Framing ❑Mechanical Final <br /> -A Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Root Nailing _ ough IR'Sorvice Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Root drains ❑Building Final ❑Gas Pipe Final HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL PA APPROVAL FINAL APPROVAL THIS PERM OK FOR I. .O. ORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM IN0PECTION: <br /> ❑ CALL(025)2575551 FOR REINSPECTION-20 hour notice required <br />
The URL can be used to link to this page
Your browser does not support the video tag.