My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
205 79TH PL SE 2016-01-01 MF Import
>
Address Records
>
79TH PL SE
>
205
>
205 79TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 3:28:49 PM
Creation date
4/18/2017 3:28:42 PM
Metadata
Fields
Template:
Address Document
Street Name
79TH PL SE
Street Number
205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br /> tk7T Dat2-23-07 , _'GYN/F-03(� <br /> Contractus <br /> Owner: <br /> Site Address: 2W <br /> TYPE OF INSPECTION REOUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑LIFER ground ❑GroundworkZlab []Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> SlabJConduit ❑Foundation []Ceiling Grid ❑Ceiling Grid <br /> [j Rough In ❑Slruclurn(Slab [_]OK to insulate ❑OK to insulate <br /> Fj Service ❑Foliating ❑Rooftop Units [-]Water Service <br /> Grounding []Insulation []Mechanical Final []Medical Gas <br /> []Ceiling Grid ❑Drywall Nailing umbing Final <br /> []Electrical Final ❑Sham Nailing CAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> []Footing drains Q Ceding Grid ❑Refrigeration ❑Rough in <br /> [-]Roof drains ❑Building Final [j Gas Pipe Final r1 HWT Final <br /> OTHER OR CONSULTATION. <br /> (] APPROVAL PAD14AL APPROVAL FINAL APPROVAL THIS PERMIT <br /> O OK FOR T.0 O e-- i�)RRECTION REOUESTED <br /> (] OK FOR C 0 VIOLATION <br /> ❑ UNABLE TOPERF0161 rr.,,'CCTION <br /> [_] CALL(425)257-868t F017 n r INSPECTION—24 hour notice required <br /> 2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.