My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 79TH PL SE 2016-01-01 MF Import
>
Address Records
>
79TH PL SE
>
215
>
215 79TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 3:33:24 PM
Creation date
4/18/2017 3:33:18 PM
Metadata
Fields
Template:
Address Document
Street Name
79TH PL SE
Street Number
215
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTI(r REPORT � <br /> Date T ,5 � G Permit: l� m <br /> Contractor: <br /> Owner: <br /> Site Avrress:--- 21s-- _ <br /> TYPE OF INSPE 10 E ESTE <br /> ELECTRICALBU DING MECHANICAL PLUMBING <br /> ❑Tomp Service FER ground ❑Groundwo lab E]Groundwork/Slab <br /> ❑Groundwork Footing ❑Rough In []Rough In <br /> ❑Slab/Conduil ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Underfloor ❑Rooftop Units ❑Water Somice <br /> ❑Grounding ❑Framing ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Root Nailing ❑Rough IrVService Hol Water Tank <br /> /Fwling ❑Coiling Grid ❑Retrigaravon ❑Rough in <br /> ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> ULTATION: <br /> ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR TC.O. ❑ CORRECTION REOUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION <br /> ❑ CALL(425)257.8881 FOR REINSPECTION-24 hour notice required <br /> Dar - <br /> DAI:,aAR,INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.