Laserfiche WebLink
INSPECTION REPORT f <br /> Date/G-9-0& Pernul (f 0& / - D/ / <br /> Contractor <br /> Owner: eu( <br /> Site Address: 7 7 J <br /> T\'PE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundworklab ❑Groundwork/Slab <br /> ❑Groundwork ❑Fooling ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Coiling Grid ❑Coiling Grid <br /> ❑Rough In ❑Structurai Slab ❑OK to insulate ❑OK to insulate <br /> ❑Semco ❑ ndedloor ❑Rooftop Units ❑Water Service <br /> E]Grounding Framing ❑Mechanical Final ❑Medical Gas <br /> El Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing 'AS PIPE <br /> SITE WORK ❑Root Nailing Aough In/Service Hol Water Tank <br /> ❑Footing drains ❑Ceiling Grid L Rehlgeratlon ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gat Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION. _ <br /> ❑ APPROVAL ❑ P IALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.0 O. ORRECTION REOUESTED <br /> ❑ OK FOR C.O. .] VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION. <br /> CALL(425)257.8881 FOR REINSPECTION—24 hour notice required <br /> l� <br /> Inspeclor: - _ _ Date: _- <br /> nv ;, uATARAA INC <br />