Laserfiche WebLink
INSPECTION REPORT <br /> Date/o/kf-o4 Permit: C <br /> Contractor: / <br /> Owner: <br /> Site Address: P/ 7 <br /> .',`PL OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Tomp Service E]LIFER ground ❑Groundwork/Slab ❑Groundwork)Slab <br /> ❑Groundwork ❑Fooling ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Underfloor ❑Rooftop Units ❑Water Service <br /> ❑Grounding 01raming ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid Zorywall Nailing ❑Plumbing Final <br /> E)Electrical Final .{]Shear Nailirg GAS PIPE <br /> SITE WORK ❑11 1 Nailing ❑Rough IrvService Hot Water Tank <br /> ❑Feobng Arai ❑Ceiling Gnd ❑Refrigeration ❑Rough in <br /> ❑Roof dr ❑Building Final []Gas Pipe Final ❑HINT Final <br /> OTH OR CONSULTATION: <br /> APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION. <br /> ❑ CALL(425)257-BBBI FOR REINSPECTION—24 hour notice required <br /> v ' <br /> l � <br /> Inspector. Date <br />