Laserfiche WebLink
• I <br /> } COMPLIANCAHECKLIST <br /> - COMPLIANCE <br /> nEOUIRED <br /> INSPECTION IMPORTANT:supply Information in the shaded area by chocking the appropriate circles. <br /> APPROVE? Disregard topics that don't descrit,a your building ar equipment.ODl10I piece checks In <br /> the two left columns. <br /> ❑ ❑ O Slab Insulation (Table 6.2)shall be R-10 and located on the: <br /> QA. Exterior (See INSULATION INSPECTION). <br /> OR <br /> 03, Interior extending downward from the top slab surface t0 Its undersurface and <br /> horizontally under the slab for a total distance of 24",or vertically 24". <br /> ❑ C] Radiant Slab Insulation (S.502,1.4. <br /> Below grade masonry wall Insulation(S.9) shall be R•10 and extend under the ^mire stab <br /> Ll <br /> 502.1.A.10}shall be full depth and located on the: <br /> 04. Exterior and rated R-10(See INSULATION PHASE). <br /> OR <br /> (DB. Intenlor (See INSULATION PHASE) <br /> ❑ ❑ Q Thermal break(s)shall be placed in the slab(S.502.1.4.8,201.1:BUILDING ENVELOPE) ' <br /> between the conditioned and unconditioned spaces chocked below, and extend from the top of the <br /> slab to the bottom, then underneath toward the conditioned space for a 24". <br /> odwelling1garage Q dweilinglconnected space Q slab odge and foundation wall. <br /> ❑ ❑ <br /> (DRadon Requirements(VIAO,S.502.1) shall be met If one of the following is chocked: <br /> O A. Net foundationyontilalion area is less then 1 Fit per 300 F12 of crawl space <br /> O B. Foundation vent.;are closable. <br /> p C.Crawl space acts as a supply,or return air plenum. <br /> ----------------------- <br /> WSEC Foundation phase requirements: <br /> Inspected by: Date <br /> FRAMING PHASE <br /> ❑ ❑ s All structural panels such as plywood, oriented strand board, particle board, and wafer board shall be <br /> lathed "EXPOSURE [","EXTERIOR",or"HUD-APPROVED". (VIAO,S.401.1) <br /> ❑ ❑ z Insulation baffles shall be placed in attics/ceilings to maintain at least 1"ventilation space and extend at <br /> least 6" vertically above balls or 12"vertically above loosefill insulation (S.502.1.4.5). <br /> ❑ ❑ e(DGlazing efficiency required under the selected option shall be S. 502.1.5, 602.7.2, Table 6-2): <br /> Q s U.70 (Option 1) s U.65(Options II,IV) O e U 45 (Option ption on111) <br /> Vil) <br /> �s U.60(Option V) �s J.50 (Option VI) <br /> Symbols used: =equate >greefor then c loss then i greater then orequel s lose then or equal <br /> UPDATED SEPTEMBER 1991 <br /> Page 2 of 6 <br />