Laserfiche WebLink
LAND TECHNOLOGIES, INC . <br /> \1,\Y OUT 01: . No WAY" <br /> July 25, 1996 <br /> City of Everett 3 3 G - W" AI S eU <br /> 3200 Cedar St. <br /> Everett, WA 98201 <br /> Ann: Alr. Ted Budden <br /> Re: Structural Fill Plat.ment <br /> Heritage Estates. L•%erett. Washington <br /> Dear Mr. Budden: <br /> This letter serves as confirmation that structural till was placed in accordance standard engineering practice in <br /> Lot Numbers 10 through 13. at the west arca of the referenced project. <br /> As recommended in my letter report dated September 19. 1995 (a copy of which is attached): <br /> • the topsoil and other organic laden soils were stripped from the areas to receive fill; <br /> • on-site soils. suitable for use as structural fill, were placed in loose, horizontal lifts of 8 to 10 inches; <br /> • the fill was keyed into the native soils; <br /> • the fill was thoroughly compacted using a vibratory smooth drum roller; and <br /> • test results confirmed that the fill had been placed to at least 95 percent of the modr'ied Proctor dry <br /> density(ASTM: D 1557). <br /> Please feel free to call if you have any additional questions. <br /> Sincerely, <br /> Land Technologies, Inc. <br /> Peter R. Moon, P.E. CITY OF EVERETT <br /> Geotechnical Engineer Bldg. Permit Counter <br /> 18820 3rd Ave NE - Arlington WA 98223 (360) 652-9727 Fax (360) 652-5374 <br />