My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2504 80TH PL SE 2016-01-01 MF Import
>
Address Records
>
80TH PL SE
>
2504
>
2504 80TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 4:43:36 PM
Creation date
4/18/2017 4:43:21 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH PL SE
Street Number
2504
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLIANCE NWEC LOWRISE RESIDE l'ITIAL COMPLIANCE CHECKLIST <br /> xy flEOUIRED� Electrlcali heated dwellings . 3 st_orlos, Zone 'I Western Washington,_ <br /> INBPECTICN <br /> D APPRovEo IMPORTANT: Please supply Information requested In the appropriate <br /> y ta shaded boxes below. Disregard boxes that don't describe your building or <br /> M equipment. DQ-LOT place chocks In the two loft columns. <br /> Balk <br /> oo NWEC cumpllance pathway selected on page 2 of this form: <br /> H H ❑Chapter 6, Option I E3 Chapter 6, Opllon II Chapter 6, Option III <br /> y ❑Chapter 6, Option IV ❑ Chapter 4 Chapter 5 <br /> x _ _. <br /> 8t <br /> CH INSULATION PHASE <br /> H� Walle(Ineluding rim joist,) are Insulated without compression to: <br /> Z H \' R•24 (Ch M6,Optlon 11) R-fOh ft 4 or 5) <br /> y ❑R-19 batt (Chg6,options I,III,IV) ❑ <br /> ❑ Vaulted callings are Insulated without compression to: <br /> n d y ❑ R38(Ch k6, all options) j4 R 3(Ch 114 or 5) <br /> t�+ Skyilght well Insulation Is properly Installed and equivalent to standard wall R•values <br /> y y ❑Ceiling insulation belts in place behind skylight wails <br /> O ❑ Vapor retarders Pro r. ulred In floors,walls, and some ceilings. Select one opt7eachthatwill Incorporate Into lsubtlo r ng:plyFloors: ❑subfloor plywood labeled EXPOSURE 1 ❑Polyplastic(i4 Walls: ❑ Poly plastic (a 4 Mil) ❑backed baits <br /> �� Ceilings: ❑Not required whore ventilation space averages>12"above Insu <br /> ❑lace stapled backed balls ❑ Poly plastic(14 mill <br /> E Required wall Vapor retarders are properly Installed toward the warm aide, tears are patched. <br /> maximum slzing requirement will Is met wlth following system:Max.output KW <br /> Mir. Modal/q 1, j KW <br /> Maximum allowed heating system capacity (150%of calculated design load) Is <br /> Heat Pump Officlency will be met under the following compliance path: <br /> owMJI ❑Ch 116, Option IV:air source heat pump: HSPF i 6.8 <br /> ❑Ch A5 air source heat pump:HSPF,, 6.8,COP> 2.7/2.0 <br /> 0 C q5 waver sourcu heal pump: COP,, 3.0 <br /> _._re <br /> 0 Healing system elllclency enA �Izing requirements are mat as represented In the box above. <br /> Corrections: <br /> NWEC Insulation phase requirements: <br /> Approved by: <br /> 0 mbols used ='e909I9 then —< Inns than r Oremrsr then orequal situ rhon ori ud <br /> wruFeb u Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.