Laserfiche WebLink
F <br /> CLINSPECTION REPORT <br /> Address <br /> Contractory. Wllu l?�44c . __ l <br /> OwnerlL4 t 15 <br /> Date... <br /> PR VAL U PARTIAL APPROVAL <br /> J VIOLATION U CORRECTIOM REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259-a810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE� PRE71JES PRIOR TO OCCUPANCY.I ea�v PM <br /> — --_ <br /> Inspector 1fr« <br /> Date <br /> TYPE OF INSPECTION REQUESTE <br /> J Temp.Elect. U Framing <br /> J Fooling J Drywall,Nailing Gas PipIng <br /> J Foundation J Shear Nailin 9 onsultakon <br /> J Ductwork U Grid g U Groundwork <br /> U Wood glove J Rough-in <br /> J S1na�t.Slab <br /> U Mason <br /> J Other J Insulation <br /> J BL Pmt,No, XMECH:Pmt.No.10/ 9 91g.., <br /> CJ ELEC:C:Pmt.No. J PLBG:Pmt. No. <br />