Laserfiche WebLink
INSPECTION REPORT <br /> ' l <br /> Address <br /> Contractor Q <br /> Owner -- <br /> Date <br /> wner -Date <br /> PPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can ne approved. <br /> J Please contact inspector and arrange lot appointment. <br /> J was not able to perform inspection. <br /> J CALL 259.8810 FOR Rr:INSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector —-- Date��/TYPE OF INSPECTION REQUESTED <br /> ras Pi ing <br /> J Temp. Elect. J Framing pp <br /> J FoolingJ Drywall.Nailing J Groundwork lao rk <br /> J Foundtion J Shear Nailing J Groundwork <br /> J Ductwork J Grid J inal Slab <br /> i- <br /> J Rough-in mel <br /> J wood Stove . <br /> J Service J Insulation <br /> J Masonry J Other <br /> J BLDG:Pmt. N3. <br /> CCH: Pmt. No. <br /> J ELEC: Pmt. No. 'J Pt.BG: Pmt. No. <br />