Laserfiche WebLink
INSPECTION REPORT <br /> %4rr Address — — - J Oq — S�� l <br /> Contractor � `, <br /> �I� ` <br /> � Owner <br /> Date 5-1 (2 5' <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> J OLATION U CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.9810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> i <br /> Inspector :J—Date <br /> OFINSPECTION REQUESTED <br /> J p. Elect. 1�raming J Gas Piping <br /> oofing 4.7�rywalf,Nailing J Consultation <br /> J Foundation hear Nailing J Groundwork <br /> J Ductwork J Grid J Struct.Slab <br /> U Wood Stove J Hough-in J Final <br /> U Masonry U Other e J Insulation <br /> L�LDG:Pmt.No.47W L J MECH:Pmt. No. <br /> J ELEC:Pmt.No. J PLBG:Pmt. No. <br />