Laserfiche WebLink
�56a 35 <br /> GeoeEnginmrs <br /> May 28, 1997 ConsultingEngtneen <br /> and Gait denttara <br /> Otfm In Washlnlorn, <br /> Oft",and Alalia <br /> SGA t_orroration <br /> 6414 - 204th Street Southwest. Suite #200 <br /> Lynnwood, Wuhington 98036 <br /> Attention: Bob Hut <br /> Geotechnical Consultation <br /> 80th Street Development <br /> Everett, Washington <br /> File No, 3225-012.37 <br /> INTRODUCTION <br /> The letter presents the results of our geottchnlcal consultation for the 80th Street <br /> N Development located west of the Intersection of 80th Street Southwest and Hardeson Road In <br /> Everest, Washington. The development will include one building and associated paved parking <br /> try area. We understand that cuts on the order of 8 feet will be nude on west portion of the site and <br /> N fills on the order of 15 feet will be made on the cast portion of the site. <br /> N The purpose of our geotechnical consultation is to (1) review a previously completed <br /> CY). geotechnical engineering study for the Lite, (2) otuerve the excavation of additional test pits <br /> across the site to confirm the subsurface cooiitions, and (3) indicate our concurrence with or <br /> suggested modifications, as appropriate, to the site development recommendations presented In <br /> the previumly completed study. <br /> SUBSURFACE INFORMATIONd <br /> The previously completed study we reviewed is entitled "Subsurface Exploration and <br /> Geotechnical F ngineering Report, '75th Street S.W. and Hardeson Road Parcel No. 1, Everett, <br /> Washington,' prepared by RittenHouse•Zernan d Associates. dated lily 5, 1990. A total of six <br /> test pits were completed for the previous study which were located along the north and south site <br /> boundaries. <br /> Ce0Enpnars,IM <br /> 8410 :541h Avetnu KE <br /> Redmond,WA 98052 <br /> Tkkplgot(206)861.6000 <br /> Fu(206)8516050 <br />