Laserfiche WebLink
Cornerstone Columbia Development Co. W-6984 <br /> 5 July 1990 Page 2 <br /> This summary is presented for introductory purposes only and should be used in <br /> conjunction with the full text of this report. The project description, site conditions, and <br /> our detailed design recommendations are presented in the text of the report. The <br /> exploration procedures and detailed exploration logs are presented in Appendix A. <br /> 2.0 PROJECT DESCRIPTION <br /> The project site is located south of the intersection of 75th Street S.W. and Hardeson <br /> Road in Everett, Washington. The site has been designated "Parcel Number 1" in our <br /> discussions during this study, and is located as shown on Figure 1, the Site and <br /> Exploration Plan. The topography slopes up moderately toward the south from a low <br /> elevation of approximately 485 feet to a high of 590 feet. The 16 acre parcel is nearly <br /> rectangular in shape and approximately 550 feet in a east west direction by 1400 feet in a <br /> north south direction. We understand the proposed development will include office <br /> structures and associated parking. At the time of this study building locations were not <br /> established. The conclusions and recommendations in this report should be considered <br /> preliminary for project planning. When building locations and structural loadings are. <br /> establishedduring final design, we recommend that the recommendations in this report <br /> be re-evaluated for the specific site development. <br /> The purpose of this study was to establish general subsurface conditions at the site from <br /> which conclusions and recommendations for foundation design and construction for the <br /> project could be formulated. The scope of work consisted of a field exploration <br /> program, geotechnical engineering analysis, and report preparation. During final design <br /> of the nature, design, and location of the facilities, the conclusions and <br /> recommendations contained in this report should be reviewed and modified, if <br /> necessary, to reflect the final proposed development plans. This report has been <br /> prepared for the exclusive use of the Cornerstone Columbia Development Co. and their <br /> agents for specific application to this project in accordance with generally accepted <br /> geotechnical engineering practices. <br /> 3.0 SITE CONDITIONS <br /> The site conditions were evaluated for this study in June 1990. The surface and <br /> subs:jrface conditions are described below, while the exploration procedures and <br />