My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 80TH ST SW BLDG SHELL 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1111
>
BLDG SHELL
>
1111 80TH ST SW BLDG SHELL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 7:19:13 PM
Creation date
4/18/2017 7:18:31 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1111
Tenant Name
BLDG SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cornerstone Columbia Development Co. W-6984 <br /> 5 July 1990 Page 2 <br /> This summary is presented for introductory purposes only and should be used in <br /> conjunction with the full text of this report. The project description, site conditions, and <br /> our detailed design recommendations are presented in the text of the report. The <br /> exploration procedures and detailed exploration logs are presented in Appendix A. <br /> 2.0 PROJECT DESCRIPTION <br /> The project site is located south of the intersection of 75th Street S.W. and Hardeson <br /> Road in Everett, Washington. The site has been designated "Parcel Number 1" in our <br /> discussions during this study, and is located as shown on Figure 1, the Site and <br /> Exploration Plan. The topography slopes up moderately toward the south from a low <br /> elevation of approximately 485 feet to a high of 590 feet. The 16 acre parcel is nearly <br /> rectangular in shape and approximately 550 feet in a east west direction by 1400 feet in a <br /> north south direction. We understand the proposed development will include office <br /> structures and associated parking. At the time of this study building locations were not <br /> established. The conclusions and recommendations in this report should be considered <br /> preliminary for project planning. When building locations and structural loadings are. <br /> establishedduring final design, we recommend that the recommendations in this report <br /> be re-evaluated for the specific site development. <br /> The purpose of this study was to establish general subsurface conditions at the site from <br /> which conclusions and recommendations for foundation design and construction for the <br /> project could be formulated. The scope of work consisted of a field exploration <br /> program, geotechnical engineering analysis, and report preparation. During final design <br /> of the nature, design, and location of the facilities, the conclusions and <br /> recommendations contained in this report should be reviewed and modified, if <br /> necessary, to reflect the final proposed development plans. This report has been <br /> prepared for the exclusive use of the Cornerstone Columbia Development Co. and their <br /> agents for specific application to this project in accordance with generally accepted <br /> geotechnical engineering practices. <br /> 3.0 SITE CONDITIONS <br /> The site conditions were evaluated for this study in June 1990. The surface and <br /> subs:jrface conditions are described below, while the exploration procedures and <br />
The URL can be used to link to this page
Your browser does not support the video tag.