My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 80TH ST SW PANDA MFG 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1111
>
PANDA MFG
>
1111 80TH ST SW PANDA MFG 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 8:03:31 PM
Creation date
4/18/2017 8:03:18 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1111
Tenant Name
PANDA MFG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul -08-98 02 : 52P P . 02 <br /> Atrl - 07-911 03: 47P Thaime1 Supply SEA P .01 <br /> - — — -� 00 X002 <br /> 4rrV-AIR„ j cJ . <br /> Qp <br /> Unit Heater Hanging Bracket Kit <br /> Installatio Instructions <br /> Part # 87277 Orr USEp <br /> For.utit hater models SEP 230.345, 1IEP 200 300& HED 200.300 !!51-r_PaQO <br /> This kit maks it possible to suspend these heaters with 2 hangers instead o(4, giving the installer the choice of <br /> using 3/4” iron pipe or 1/2"threaded rod. <br /> Using 3/4"Iron ripe Hangars Using v2"Threaded Rod hangers <br /> e, <br /> 1. Mount do two baekeu on the better et shown in fligi I. Mount We rwo`•:ackeu on the heater u shown in rig.) <br /> with the 7h'bolt/and wtihen provided.Tighten seeursly with the 3q"bolt,and washcrt provided.Tighten securely. <br /> The bucked should be muuntod w1d the open sides coward The bracktu should be mounted with the open sides rowed <br /> the outside of the heater. the outei!•o the hater. <br /> 'A. Intert the 112"boll through the 3/4"hun pipe cap and tighten I Install: I nvu prn•ided in tM kit on threaded rod <br /> with she 10-nut as shown In M+- 2.Screw de up onto the (not pt 1 in this kit)approaimucly I I/2"up u shown <br /> lion pipe hangars.(not prdvl+od In this kit) in fig.3 - <br /> 3. Haiii The heater intoplooe lnleniple the 1/2'hanger bolts into 1. H0lal the`enc:Into place inserting the 1/2'thraded rods <br /> the henpr►racketflou.WetheSlots toward the Motorsnd into thehcfubneketslou.Usethe&lots toward tMmotor <br /> of the heatu. - end of the heater. <br /> 4. Vito the washers tad stela provided and eompiets assembly e. Using the washers and nue provided,complete assembly as In <br /> as in fig.2 Do not lightan until a level mounting position is fig-) D0110t uthtan until a Icwl mounting position is achieved <br /> achieved. i. iwvel heater►y sliding back and forth in odjueanant slot. <br /> S. Levs1 hc■ta by rilding bask uvl ford In adjustment slat. 6. Once levaL tighten HI hardware. <br /> 6 once level,tighten all hardware. <br /> A ! <br /> Never ase gat Ilse er vent pipe to help Iwrl unit. <br /> Vai t be v J �j,�eatlae or otnlo ,_ <br /> Figure 1 <br /> Mount the han4et brackets Ust the a:Jostmeot slots claim to <br /> with the arm iidel out. the motor end of the hater. <br />
The URL can be used to link to this page
Your browser does not support the video tag.