My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 80TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1118
>
BASE FILE
>
1118 80TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 3:00:16 PM
Creation date
4/18/2017 8:39:16 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1118
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 1, 1971 <br /> CITY OF <br /> everett <br /> CIT, Nat • Is,n[M <br /> [V[II[TTr W.1xNOtOM <br /> M[N[CTIOX O[�11N1NCLT <br /> Robert Christenson <br /> Pepsi-Cola Co. <br /> 3231 Broadway <br /> Everett, Washington 98201 <br /> Re: Permit for new building, 1118 Both S. W. , Everett, Wash. <br /> Dear Mr. Christenson: <br /> The permit for your new building was issued with incomplete drawings <br /> for your convenience. The permit was issued subject to your submitting <br /> the balance of the drawings requested by the City of Everett <br /> Your submittal of the metal building is not sufficient to meet the <br /> requirements of the City. The permit was issued for foundation work <br /> only. No additional work will be permitted without a pErmit and if <br /> any work is done beyond the foundation, the permit will be revoked. <br /> The required drawings include the following: <br /> 1. Two copies of complete drawings prepared b, an Architect or <br /> Engineer registered in the State of Washington. <br /> 2. The metal building drawings shall be pre•'jared and designed by <br /> an Engineer or Architect licences in the State of Washington. <br /> 3. Submit calculations or manufacturers lotding tables to justify <br /> loading and deflection requirements. <br /> 4. Submit complete plumbing plans and isometic riser diagrams. <br /> 5. Submit complete electrical plans and service diagrams. <br /> We are waiting for the above submittal before continuing with the plan <br /> check. <br /> Yours truly <br /> John H. Farrens, Jr. <br /> Plan Checker <br /> I <br /> JHF:eb <br /> I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.