Laserfiche WebLink
everett <br /> October 16, 1981 <br /> Manager <br /> Rainier News <br /> 1122 80th St. S.W. <br /> Everett, WA 98203 <br /> Subject: Stormwater Detention System at� 122 80th St. S.W. <br /> To Whom It May Concern: <br /> To ensure proper storm water management, the City of Rverett Rngineering <br /> Department is routinely inspecting privately owned storm water det.,ntlon <br /> systems on an annual basis. Careful attention must be given to the <br /> maintenance of these drainage systema. It is the property owner's <br /> responsibility to regularly have all the catch basins In the system <br /> cleared of sediment, in particular, the catch basin housing the flow <br /> restrictor. If the reatrictor becomes clogged, the detention system <br /> will not function and the potential for flooding and pollution of the <br /> receiving water bcdy increases. <br /> The drainage system at the above address was t cantly it.spected. We <br /> found that the lid to the reatrictor catch basin was not installed per the <br /> approved drainage plan. <br /> The inst111led lid is wood and not attached to the catch basin. Please <br /> see that the lid Is replaced by an APWA approved lid as called for in <br /> the drainage plan. Perhaps you could get the contractor, Norm Anderson, <br /> to do the work. <br /> Pleane see that the work is completed within 30 days of your receipt of <br /> this letter. <br /> Sincerely, <br /> ALFRED R. T11EAr. <br /> Director of Public Works <br /> By: Dan Mathias <br /> Assistant Engineer <br /> act hots Anderson Construction <br />