Laserfiche WebLink
EVERETT WATER DEPARTMENT <br /> 3200 CEDAR STREET <br /> EVERETT, WASHINGTON <br /> COST ESTIMATE SHEET <br /> TYPE OF INSTALLATION : Tap 12" - lay water line to property line <br /> LOCATION : 1122 80th Street S.W. <br /> REQUESTED BY : Rai nierNews <br /> DATE OF REQUEST : 4-15-80 <br /> SIZE : 611 <br /> ESTIMATED COST : $4,087.66 <br /> (Whenever the estimated cost is not sufficient to cover the total <br /> expense for labor, materials, equipment rental and administration, <br /> the deficit shall be charged to the property for which such installa- <br /> tion was made and the owner thereof, and provided further, that any <br /> excess payment shall he returned to the person applying for the in- <br /> stallation. ) <br /> ESTIMATED COST ITEMIZED AS FOLLOWS: <br /> Labor $ 1 ,718.42 <br /> Material 1 ,053.55 <br /> Equipment rental 713.70 <br /> Street restoration 100.00 <br /> Administration and supervision 501 .99 <br /> Total estimated cost of project $ 4,087.66 <br /> U-70on Wahl - Supervisor Iq- ater <br /> cc: Bud Krom 1 <br /> Don Weitkamp <br /> Bob Sparlin <br /> Larry Callahan Gl0 <br /> Lonnie-Engineerin <br /> is Public ft'Ks ucpL <br />