My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3304 252nd St. NE <br /> Arlington,Washington 98223 <br /> Telephone: (360) 435-0449 <br /> DiversifiedEngineering Services Fax: (360) 435-9008 <br /> August 10, 1995 <br /> File: 0100-01-01 <br /> Ms. Jane Zimmerman <br /> City of Everett Public Works <br /> 3200 Cedar Street <br /> Everett, WA 98201 Drainage Calculations — Dennis Petroleum <br /> Facility, PC H48522 <br /> Dear Ms. Zimmerman: <br /> Enclosed you will find the revised storm water calculations which includes an analysis of the <br /> pipe conveyance system through the project and through the Washington Natural Gas site to <br /> 75th Street S.W. The detention pond has been revised to include a wetland treatment cell. <br /> As a result of adding the wetland treatment cell the pond control structure had to be revised <br /> as well. All calculations include the paved access road as well as existing runoff from Lot I. <br /> Respectfully, <br /> Dive sifted Engineering Sgkviccs �D <br /> b ee <br /> David L. Parshall,P.E. <br /> AUuu- 101995 I� <br /> ............. <br /> CITY OF EVERETT <br /> Bldg, Permit Counter <br />
The URL can be used to link to this page
Your browser does not support the video tag.