My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ww� P!/BL/C WV/" <br /> X. , <br /> October 17, 1995 <br /> I <br /> Mr. Gene Farris <br /> Larry Gottschalk Architect <br /> N 2312 Cherry Rd <br /> Spokane WA 98216 <br /> RE: Owner: Dennis Petroleum <br /> Job Address: XX 80th St SW <br /> Plan Check A: B-48522 <br /> Dear Mr. Farris: <br /> In response to your application for a construction permit, your plans have been <br /> examined and you are advised that the issuance of a permit is being withheld for the <br /> reasons listed below. These comments address building issues only, additional <br /> revisions or additions may be required by other departments (such as Utilities, Planning <br /> or Fire). All references refer to the 1994 Uniform Building Code, as amended by the <br /> State of Washington and /or Washington State Energy Code 1995 Edition, unless <br /> stated otherwise. <br /> In Order for the processing of your application to continue, it will be necessary to <br /> provide the Building division with two complete new sets of drawings reflecting the <br /> corrections requested. <br /> 1. I have received plans with a revision date of lune 1, 1995. These plans are <br /> incomplete. <br /> 2. As per my letter of September 11, 1995: <br /> a. No roof drainage provisions are shown for loading dock canopies. <br /> b. Items k3 and 4 were not addressed. <br /> C. Item k5 was not addressed. No van accessible signage was shown <br /> d. Item q6 was not addressed. <br /> e. Item 118 regarding structural drawings was not addressed. <br /> Upon resubmittal of the drawings, your application will be given priority and plan <br /> review will recommence. <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (206)259.8800 • Fax (206) 259-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.