My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. If utilizing fencing, it should be 6 feet chain link. <br /> i. During the final stages of construction, please contact Dick Thornberry, Crime <br /> Prevention Officer, at 259-0416 for further security recommendations. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br /> development. For further information about the electrical service requirements for this <br /> project, please call Kurt Martin of the District's Customer Engineering Office, Everett at <br /> 258-8291. <br /> 3. GTE Northwest Incorporated has facilities near this location. However, any building <br /> entrances must be coordinated at least 60 days in advance. The cost of any relocation of <br /> GTE facilities that is required to construct the new apartments will be at the total expense <br /> of the developer. Any relocation will take 60 to 120 days. Please contact Debbie <br /> Condron, Engineer-OSP at 356.4053 if you have any questions regarding this building <br /> entrance. <br /> 4. GTE Northwest Incorporated will provide service to the site. However, new telephone <br /> cable construction will be required in conjunction with the site development. GTE's <br /> engineering will begin when they are notified of your construction schedules and telephone <br /> requirements. <br /> It will be the developer's responsibility to provide a suitable combination of conduit and <br /> trenching and/or riser conduit to accommodate GTE's network communications cable <br /> within the complex. Provided that an acceptable combination of conduit and/or tre⢠Ching <br /> is incorporated into the project to accommodate G"rE's entrance cable, there will be no <br /> costs to the developer for GTE's cable. <br /> If a rearrangement of existing cables on premises or on the right-of-way is necessary, <br /> appropriate charges will be estimated and GTE's Guaranty of Payment form will be <br /> forwarded to you for your signature. Prior to commencement of GTE's engineering for <br /> such rearrangement, a deposit will be required. To insure timely telephone service, GTE <br /> requests ninety (90) days lead time for engineering, procurement, and installation of cable <br /> and/or GTE's equipment. <br /> Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require additional <br /> information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.