My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cornerstone Columbia D• 3lopment Co. W-6984 <br /> 5 July 1990 Page 8 <br /> 4.4 Slab On Grade Floors <br /> We anticipate that development of this parcel would include slab on grade floor <br /> construction. The subgrade to support the grourp levei floor slab should be prepared in <br /> accordance with the previous Site Preparation recommendations (Section 4.1). The slab <br /> on grade should be founded on a prerolled medium dense native soil or structural fill <br /> compacted to at least 90 percent density (ASTM:D-1557). We recommend that the floor <br /> slab be underlain by at least 4 inches of clean, washed rock, or pea gravel to serve as a <br /> capillary break and working surface. Additionally, an under slab impervious moisture <br /> barrier should be utilized to protect the slab from dampness. If the base of the floor slab <br /> is set at or below adjacent exterior grades, perforated pipe perimeter drains should be <br /> installed around the building foundations as outlined in the following Drainage <br /> Considerations (Section 4.5) of this report. <br /> i <br /> I <br /> 4.5 Drainage Considerations <br /> At this site, the silty, glacially consolidated soils at depth may result in development of a <br /> "perched" grcundwater condition. Additionally, traffic across the soils when they are <br /> damp or wet will lead to the disturbance of the otherwise firm strata. Therefore, prior to <br /> site work and construction, the contractor should be prepared to divert surface water <br /> runoff around exposed ground surfaces. This should include diversion of water runoff <br /> from the adjacent property west of the site, which presently drains onto the subject <br /> property. Additionally, if areas of spring activity or seepage are encountered during <br /> construction in excavations; culverts, subdrains, or pump sump installation may be <br /> necessary to transport the water pass the area being developed. <br /> In planning, grades should be set so that water does not collect adjacent to the <br /> buildings. Instead, the ground should be sloped downward away from the structures so <br /> that runoff may be carried to a suitable discharge. The base of all retaining walls, and <br /> building locations where the floor level is at or below adjacent outside grade, should be <br /> protected from seepage or groundwater by a perforated footing drain pipe at the base <br /> elevation. With the sloping site and possible perched ground water, we anticipate that i <br /> footing drains could be required for most buildings on the site. The perforated drain pipe <br /> should be totally surrounded by at least 6 inches of pea gravel. This foundation drain <br /> system should be installed to discharge via tight line by gravity to a storm sewer or other <br />
The URL can be used to link to this page
Your browser does not support the video tag.