My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1125 80TH ST SW 2016-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1125
>
1125 80TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 9:09:17 PM
Creation date
4/18/2017 9:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cf G <br /> PUBLIC WORKS <br /> Ev Err <br /> MEMORANDUM la 1' <br /> I� (/0� C <br /> t ,4-r <br /> TO: Kirk Brooks/AI Locke <br /> FROM: lane Zimmerman ` I i <br /> t 1 , <br /> DATE: July 14, 1995 <br /> SUB.IECT: Drainage Calculation Review, Dennis Petroleum ' <br /> General: <br /> The MDNS states that "if an infiltration basin is not constructed for treatment of <br /> stormwater, a portion of the building rooftop runoff shall be routed to roof downspout <br /> systems designed and constructed to City standards, if suitable soils exist on the site. <br /> The portion of the roof runoff routed to these ,ystems shall be designed so that the <br /> volume of water infiltratw.q into the ground on the site after development matches, as <br /> closely as is feasible, the i olume of water infiltrating into the ground under existing <br /> conditions." If suitable s.ils do exist on the site some roof-top infiltration will be <br /> required. The applicant should consult the City's Design and Construction Standards <br /> and Specifications for more details on design of infiltration systems. The attached table <br /> can be used to size any systems provided for this site. The pond calculations can be <br /> changed to account fot any reduction in roof-top impervious surface routed to the <br /> pond... <br /> The MDNS also states that "this project shall design a storm line and connection point, <br /> for future stormwater discharge from lot 1, that bypasses.the stormwater <br /> retention/detcntion and runoff treatment facilities on this project site and that ties into <br /> the storm line extension from the Washington Natural Gas site. This storm line and <br /> connection point shall be contained within the existing storm ch •,nage easement on this <br /> site." Calculations are needed for this line and the calcs for the size of the WNG <br /> extension need to account for existing rates of runoff from lot 1. <br /> The calculation package needs to state whether or not the calculations include the <br /> access drivt. If the access drive is not included, it needs to be. <br />
The URL can be used to link to this page
Your browser does not support the video tag.