My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 80TH ST SW BLDG A TOOLLESS PLASTIC SOLUTIONS 2018-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1410
>
TOOLLESS PLASTIC SOLUTIONS
>
1410 80TH ST SW BLDG A TOOLLESS PLASTIC SOLUTIONS 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 11:51:53 AM
Creation date
4/18/2017 11:32:01 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1410
Unit
BLDG A
Tenant Name
TOOLLESS PLASTIC SOLUTIONS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C c <br /> REG 12.23-2010(THJ) 12:48 <br /> G.B. REG-1 029780 <br /> CT i <br /> &V7 <br /> F�ERHIT No.1012020 <br /> 1 F./C $126.91 <br /> (425) 257-8810 T j $126-91 <br /> ;1VIV,, $126.91 <br /> Plan Check No.: B1012.020 <br /> Application Date: 12/23/2010 <br /> Tenant: TOOLLESS PLASTIC SOLUTIONS <br /> Owner. WRENCO PROPERTIES LLC <br /> Job Address: 1410 80TH ST SW BLDG A <br /> Proposed Use: COMMERCIAL <br /> Description of Work: T.I. FOR TOOLLESS PLASTIC SOLUTIONS <br /> Plan Check Fee Paid: $126.91 <br /> The building permit application for the above•rcferenced project is being conditionally accepted for filing <br /> pending the determination of Its completeness, <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit appli, tion, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> 0 <br /> gna urc Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.