Laserfiche WebLink
A <br />FRANKLIN <br />ENGINEERING <br />MECHANICAL CONSULTING <br />April 7, 2008 <br />RE: CITC, Suite D <br />526 Commerce Ctr <br />80"' St SW <br />Everett, WA <br />625 4th Avenue <br />Suite 202 <br />Kirkland.IVA 98033 <br />rH 425 827-3324 <br />FAX 425 827-6252 <br />hvacOfrank lineng.com <br />ENVELOPE SUMMARY <br />Expansion of Office space into existing Warehouse area. Addition complies with 2006 <br />WSEC using the Component Performance approach with heating by Other Fuels. <br />Doors (Opaque): Wood, U=0.50, default (Table 10-6). <br />Other Roof Type 1: R-30 batt insulation on T-bar ceiling. U=0.037, calculated. <br />Other Roof Type 2 (Men 109): R-30 batt insulation on GWB ceiling. U=0.076, <br />calculated. <br />Wall #1 (Opaque, Existing Demising): Metal studs, min. 5-1/2", 16" oc with R-19 batt <br />insulation, U=0.109 default (Table 10.5A). <br />Wall #2 (Opaque, OfficelWarehouse, Type B): Metal studs, 6", 24" oc with R-21 batt <br />insulation, U=0.09 default (Table 10.5A). <br />Slab on Grade: No Insulation., F=0.73, default (Table 10-2). <br />Please note that these values are minimum insulation requirements for code compliance. <br />Higher insulation values may be installed. <br />