My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1420 80TH ST SW MD SHEETMETAL 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1420
>
MD SHEETMETAL
>
1420 80TH ST SW MD SHEETMETAL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 11:48:53 AM
Creation date
4/19/2017 12:13:18 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1420
Tenant Name
MD SHEETMETAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5NG/NEER/NG / P116L/L SERN/Cc5 DEPARTMENT <br />April 1, 2009 <br />Michelle Davis <br />12616 - 67' Ave SE <br />Snohomish WA 98296 <br />RE: Owner: MD Real Estate LLC <br />Job Address: 1420 - 8Y1 St SW Np <br />Plan Check No: B0903-031 <br />Dear Ms. Davis; <br />In response to your application for a construction permit, your plans have been examined and you <br />are advised that the issuance of a permit is being withheld for the reasons listed below. These <br />comments address building issues only. Additional revisions, or additions, may he required by <br />other departments (such as Utilities. Planning or fire). All references refer to the 2006 International <br />Building Code, as amended by the State of Washington and auopted by the City of Everett and the <br />Washington State Energy Code, 2006 Edition, unless stated otherwise. <br />In order for the processing of your application to continue, R will he necessary to provide the <br />Building Division with hvo new sets of revisions reflecting the corrections requested. <br />I. The plans should include the requirement for posting of the live load in accordance with <br />IBC 1603.3. <br />2. The stairway should be adjusted to permit handrail extensions at both sides at the top. <br />Showing the handrails on the plan views might also help to clarify. IBC 1012.5. <br />3. The plans should include the requirement for sprinklering the mezzanine underside. <br />If you have any questions, please call me at 425-257-7264. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br />the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />Steve Miller <br />Associate Engineer <br />Imb, .1w W"1411114b 0u• S15 W .n <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.