My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1420 80TH ST SW ZUMIEZ 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1420
>
ZUMIEZ
>
1420 80TH ST SW ZUMIEZ 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 12:55:20 PM
Creation date
4/19/2017 12:17:57 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1420
Tenant Name
ZUMIEZ
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P1/5L/C WOMS <br />November 28, 1994 <br />Mr. David Murphy <br />Murphy-Varey Architects <br />1932 First Avenue #I 100 <br />Seattle, WA 98101 <br />Subject: Owner: <br />Job Address: <br />Plan Check No. <br />Dear Mr. Murphy: <br />SLF Management/Zumiez Corporation <br />1520 80th Street SW, Suite A <br />B 46201 <br />In response to your application for a construction permit, your plans have been examined <br />and you are advised that the issuance of a permit is being withheld for the reasons listed <br />below. These comments address building issues only, additional revisions or additions <br />may be required by other departments (such as Utilities, Planning or Fire). All references <br />refer to the 1991 Uniform Building Code, as amended by the State of Washington and/or <br />Washington State Energy Code 1991, 2nd Edition, unless stated otherwise. <br />t/. Due to an occupant load ever 30 (42), the office area must have 2 exits. Please note <br />exits cannot pass through warehouse areas. <br />A. Au new toilet rooms must be accessible (individual stalls within a room need not be <br />accessible when one accessible stall is provided) Sec. 3105(b)2. <br />V"'3. Please indicate location and R-value of roof insulation for office areas and warehouse <br />areas. (Wall insulation must extend to roof insulation.) Please indicate if warehouse is <br />a heated or semi -heated space. <br />L/4. Guardrail intermediate rail spacing cannot exceed 4" per public areas (office) or 12" <br />for warehouse areas. <br />In order for the processing of your application to continue, it will be necessary to provide <br />the building Division with two complete new sets of drawings reL cting the corrections <br />requested. <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (206) 259-8802 • Fax (206) 259.8859 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.