Laserfiche WebLink
P1/5L/C WOMS <br />November 28, 1994 <br />Mr. David Murphy <br />Murphy-Varey Architects <br />1932 First Avenue #I 100 <br />Seattle, WA 98101 <br />Subject: Owner: <br />Job Address: <br />Plan Check No. <br />Dear Mr. Murphy: <br />SLF Management/Zumiez Corporation <br />1520 80th Street SW, Suite A <br />B 46201 <br />In response to your application for a construction permit, your plans have been examined <br />and you are advised that the issuance of a permit is being withheld for the reasons listed <br />below. These comments address building issues only, additional revisions or additions <br />may be required by other departments (such as Utilities, Planning or Fire). All references <br />refer to the 1991 Uniform Building Code, as amended by the State of Washington and/or <br />Washington State Energy Code 1991, 2nd Edition, unless stated otherwise. <br />t/. Due to an occupant load ever 30 (42), the office area must have 2 exits. Please note <br />exits cannot pass through warehouse areas. <br />A. Au new toilet rooms must be accessible (individual stalls within a room need not be <br />accessible when one accessible stall is provided) Sec. 3105(b)2. <br />V"'3. Please indicate location and R-value of roof insulation for office areas and warehouse <br />areas. (Wall insulation must extend to roof insulation.) Please indicate if warehouse is <br />a heated or semi -heated space. <br />L/4. Guardrail intermediate rail spacing cannot exceed 4" per public areas (office) or 12" <br />for warehouse areas. <br />In order for the processing of your application to continue, it will be necessary to provide <br />the building Division with two complete new sets of drawings reL cting the corrections <br />requested. <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (206) 259-8802 • Fax (206) 259.8859 a <br />