My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1450 80TH ST SW 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1450
>
1450 80TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 1:11:14 PM
Creation date
4/19/2017 12:21:28 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1450
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />32200 Cedar Street <br />Everett, WA 98201 <br />14251 zsTVlor:Tr ; V' j f'i "! f DEC Z 0 <br />MORGAN AERO PRODUCTS <br />1480 80TH ST SW <br />PHONE (PHONE. <br />TAX PARCEL ID x I PROJECT ADDRESS <br />PESCRIPTION OF <br />ROPOSEDWORK.NEW BU7[.LIN1.1 <br />PERMIT CONDITIONS <br />Date 6/11/2002 <br />Public Works Permit PWO206-006 <br />Building Permit 0 <br />Planning Reference 0 <br />Public Works Fee E $6 , 413. 69 <br />Guarantee $ <br />1. All calls for Inspection shall be made 24 hours in advance - phone (425) 257.8810 -12-02 "30PM <br />2. All work shall be perform9d in accordance with this permit and current City of Everett esign anibytion <br />Standards and Specifications. aa��II�� ((LL <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-pgg+1z4-55JJ47.83 <br />SSHH����HHGG <br />4.50 <br />4. PER APPROVED PLANS DATED 6-10-0.. N <br />0206022 <br />SEWER <br />70.00 <br />UTILITY <br />1507.00 <br />WATER <br />190.00 <br />0 <br />0206006 <br />OTHER <br />150.00 <br />PW/MW <br />2087.90 Revre47 <br />PW/INSP <br />4175.79 <br />0 <br />177346 <br />OTHER <br />6036.00 <br />TOTAL <br />15369.02 <br />CHE <br />A OM8333 <br />!l L <br />pro d tar hsirucbon Dala <br />FINAL INSPECT N <br />Approved as Constructed Date <br />U) <br />co <br />0 <br />oZ <br />1535Y�2 <br />Vi <br />0 <br />a <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned ownerlapplicant hereby agrees to hold and <br />save harmless the City of Everett from any and all Balms for <br />damages, costs, expenses, or causes of action that may arise <br />because of Installation and maintenance of the Improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public <br />prop, amaged thereby. <br />Slgnalure of Applcen D l <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 100 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.