Laserfiche WebLink
Introduction: <br />This drainage analysis examines h _toric and developed storm runoff rates for the <br />proposed commercial development located in the southeast quarter of Section 11, <br />Township 28 North, Range 4 East, in the city of Everett, Washingrton. The site address <br />is 1480 80TH Street S.W. The 2.72-acre site is bordered by 80 " Street S.W. on the <br />north and commercial developments to the west and east. State Route 526 borders the <br />site on the south. See Attachment 1- Vicinity Map. <br />The following evaluation will consider the historical and developed storm water runoff <br />conditions. Storm water runoff rates were calculated using the SBUH Method, as <br />computed by the Water Works software, version 4 Shareware, by Engenious Systems. <br />Storm detention volumes and the orifice structure design were based on the release of <br />one half the 2-year, the 10-year and 100-year storm event for historical conditions. <br />M.1SDG12001177-SDG.01Wocs10rainegeAnelysls77.doc 3 (^ O <br />