Laserfiche WebLink
I <br />Water Quality: <br />During the construction phase of the project, temporary siltation control structures will <br />be installed. At a minimum: <br />• A silt fence will be installed along the wetland buffer and around the stabilized <br />construction staging area. <br />• Existing catch basins will be protected ner city standard detail 213. <br />• A temporary construction entrance w be installed per the TESC plan and <br />city standard detail 205A. <br />• A construction staging area will be utilized for equipment/material storage and <br />equipment maintenance during construction. <br />' The siltation control devices will remain in place until all construction work is completed <br />per the specifications and details on the construction plans and all areas are stabilized. <br />All pipes and catch basins will be cleaned and flushed prior to being put into service. <br />Once crnstructed, proper, regular maintenance of the orifices and detention system will <br />allow the system to function optimally. <br />Conclusions: <br />The proposed development will create increased stormwater runoff. It is proposed to <br />detain the increase of stormwater runoff in an underground detention vault and 24" <br />' pipes. The area above the dead storage in the wet pond will also be utilized for <br />detention storage during storm evesnts. The live storage and orifice structure will <br />attenuate the peak flow rates. <br />There are no anticipated adverse impacts on the downstream conveyance syste- 4lie <br />to this development. <br />IM.%DG\2001177•SDG.011docs\Drainage Analysis77.doc 7 <br />