My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1520 80TH ST SW 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1520
>
1520 80TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 7:44:13 AM
Creation date
4/19/2017 12:24:35 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1520
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ci <br />C Z11 <br />1`' <br />OUR SECOND HALF CENTURY <br />1 <br />air conditioning company, Inc. <br />6952 SGU tH 2291K 1 KENT V ASHMGTON W32 ' d7c,, 395 72201 FAX 061395.7223 <br />November 1. 1990 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />ATTENTION: Mr. Jack Wedeberg <br />PROJECT: J.A.G. Bldg. "B". ACCO Project #911070 <br />SUBJECT: Approval of Direct Fired Make-up Air Units <br />CONTRACTOR'S UC. a AIRCDC1131KO <br />Mn� <br />[ ` E 0 T E <br />140V 2 1990 <br />............... <br />CITY OP EVE-RETT <br />PuL•lie Works Depl. <br />Gentlemen: <br />Thank air units. You <br />one <br />mde inhelpingus resolvour e theion of our de issues and w appreciate you efor s. the extra <br />Item #4 of your letter dated 10-29-90, calls for "18 inch minimum clearance to <br />combustible floor deck or alternative installation acceptable to City Building Ulllcial". <br />We would like to propose for your consideration that the curb space between the unit <br />and the roof deck be vented as detailed on the two sketches enclosed. We believe that <br />ventilating the curb space In this manner will prevent the build up of excessive heat. <br />and give protection of the roof deck equal to/or greater than the standard 18" <br />clearance without venting. Note also that. except for the return air opening% this unit <br />Is built exactly like the listed units from Applied Air. and these Mn set on t c factory's <br />standard 12" curb. <br />By venting the curb space. we hope to avoid having to lift the units up (they are <br />already anchored down) to put Ygypsunt board. mineral wool. or other protective <br />material in the curb space. <br />Thank you for your attention in this matter. <br />Sincerely, <br />_ R CONDITIONING COMPANY, INC. <br />Ronn M. Parsley, P.E. <br />Engineering Manager <br />RMP:cb <br />JAG-MUA <br />Enclosures: T w.) (2) Sketches <br />MECHANICAL CONTRACTING . INDUSTRIAL VENTILATION • ENERGY SAYINGS CN,tR;ni :•�� hi' "'' . :rprE:, PiF.': SERvI'LE VID 44nItENgNCE. <br />oy�r.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.