Laserfiche WebLink
Pjawl <br />� J <br />\_ J <br />GENERAL MECHANICAL SPECIFICATION FOR: <br />� BLUE STREAK FINISHERS <br />NOVEMBER 26, 1990 <br />PAGE THREE <br />i <br />4. Gas Piping. <br />Install a tight shut-off gas pressure regulator, <br />capacity and range to burner requirements. <br />(See Sheet N7) Installation to Code and <br />Washington Natural Gas Co. Requirements._ <br />5. 011 Piping. <br />be per standard practice <br />Oil piping shall <br />from 3,000 gallons above ground oil tank to <br />burner location. Fasten and support otl <br />pipe (BLCK. Schedule 40 Pipe) as per sheet <br />4/5. <br />6. Oil Tank. <br />Oil storage tank,above ground installation, <br />tank to be as Mfg. by Ace Tank, Seattle, with <br />capacity of 3,000 gallons (N2 Diesel oil) <br />tank is as shown on Sheet N4, "UL-1�ike <br />Tank", tank is built and tested per "UL" <br />specifications. <br />7. Boller Stack. (See Sheet N3) <br />Provide and install per manufacturers recom- <br />mendation and to code requirements. <br />Stack to be 16" - Model PS Selkirck with <br />