Laserfiche WebLink
Y H E0 <br />H14 <br />HH� <br />OC H P4 <br />W H <br />O0 <br />OH <br />r4 toil g <br />HH <br />8 `A <br />C] qt7 y <br />t+1 r�+ <br />H W <br />HOtn <br />CZ <br />GENERAL MECHANICAL SPECIFICATION FOR: <br />BLUE STREAK FINISHERS <br />NOVEMBER 26, 1990 =� <br />PAGE SIX <br />A. Pipe: All pipe used for steam shall be as <br />shown on plans. All steam supply pipe <br />shown on Sheet N2 & N6, shall be <br />Blk. schedule 00 Stl. All pipe on <br />discharge side of flasl. tank shall be <br />scheduled 40 Blk. Steel. Copper <br />pipe (type "L" may be used for water <br />service. <br />For Gas Service: Sched. 40 Blk. <br />For Oil Lines/Tank to Burner Pump: Sched. <br />40 Blk. <br />B. Valves: In general, all valves must be rated <br />for pressure or application intended. <br />Steam outlet (boiler) 6" Flgd. OS & Y <br />250# W.P. Boiler feed/water connection: <br />250M W.P. Gate valve and 250N lift <br />check valve. Use sched. 00 nipples. <br />All High Pressure Service: <br />2}" and above Flgd. B144 Stockham <br />or <br />2 " and smaller Equal <br />Condensate and low press application <br />B120 Stockham or approved equal. <br />