Laserfiche WebLink
24. The Washington State Clean Air Act requires the use of all known, available, and <br />reasonable means of controlling air pollution, including dust. Dust generated during <br />construction activities can be controlled by wetting those dust sources such as areas of <br />exposed soils, washing truck wheels before they leave the site, and installing and <br />maintaining gravel construction entrances. Construction vehicle track -out is also a <br />major dust source. Any evidence of track -out can trigger violations and fines from the <br />Department of Ecology or the Puget Sound Air pollution Control Agency. <br />GENERAL INFORMATION <br />The Snohomish County pUD currently has sufficient capacity to serve the proposed <br />development. For information about the speciti. electrical service requirements, please <br />call the District's Everett Office at 425-258-8272 to contact a Customer Engineer. <br />12 <br />