Laserfiche WebLink
There are two functions of this proposed project. The first is to expand the loading dock <br />of the existing processing and distribution facility. The second s to construct a parking lot and <br />drainage facilities across the street on lots 7 and 8 of the Plat of Hardeson Industrial Park. The <br />sites are located at the Southeast and Northeast corners of Hardeson Road and 801s Street in the <br />Merrill and Ring Creek drainage basin. <br />The loading dock area will require some re -grading of the adjacent truck maneuvering <br />area but because there will be no increase in the total impervious area, no change to the existing <br />drainage system is being proposed. <br />The total proposed improvements to the parking lot area will cover approximately 2 <br />acres. The parking area will be covered with asphalt and planters. Onsite drainage will be <br />collected and directed into a proposed wetpond which will be located at the Southeast comer of <br />the project. A control stricture with multiple orifices will be installed to moderate flow with <br />outflow directed to the 80a' Street drainage system. The Everett Stormwater Management <br />Manual was used as a guideline for designing the storm water management system. For more <br />detail on the system see the Analysis and Design of Required Runoff Control section of this <br />report. <br />