My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
709 80TH ST SW 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
709
>
709 80TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 7:34:48 AM
Creation date
4/19/2017 12:28:50 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
709
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earth �� <br />Consultants Inc. <br />Geotechnical Engineering and Geology <br />August 10, 1983 E-2008-1 <br />Advanced Mobile Phone Service � le _ 70 <br />3350 - 116th Avenue S.E. <br />Bellevue, Washington 98004 <br />Attention: Mike Young <br />Subject: Compaction Testingand Foundation <br />Excavation Observation <br />AMPS Cell Site SEA - "B. UU" <br />Marysville, Washington <br />Gentlemen: <br />At your request, we provided foundation excavation observation <br />and compaction testing services at the <br />-subject g site <br />tecbetween <br />hnicalstuly <br />19 and July 26, 1983. We earlier performed <br />for the project and presented the results in our report dated May <br />3, 1983. Our present services included performing compaction <br />tests in fill materials placed as backfill for the antenna founda- <br />tion and in the building slab areas. In addition, we examined the <br />aantenna dequate bearingd ion capacity exion to st at the ermine that bearing materials with <br />bearing level. <br />A total of six compaction tests were performed at the <br />locations noted in Table A, Summary of In -Place Density Test <br />Results. Tests were performed in accordance with ASTM 'rest <br />Designation D-2922 (Nuclear Gauge Method). The resalts of our <br />compaction tests are listed on Tab).e A. Representative soil <br />samples were returned to our laboratory for Laboratory Maximum Dry <br />Density Tests in accordance with ASTM Test Designation D-1557-70 <br />(Modified Proctor). <br />An engineering geologist from our firm visited the site on <br />July 19, 1983 to observe the foundation excavation Ear the <br />nineteen (19) toot squire by five foot deep mat foundation. We <br />understand that ttte foundation is designed for an allowable <br />bearing pressure of two thousand ( 2000 ) pound s IS s, 2pgDl <br />ICI <br />foot <br />AUG 1 <br />1805 - 136th Place N.E., Suite 101, Bellevue, Washington 98005 <br />Phone: (206) 643-3780/Seattle (206) 464-1584 <br />CITY OF EVERET I <br />offices In Washington 8 Oregon <br />
The URL can be used to link to this page
Your browser does not support the video tag.