Laserfiche WebLink
R ttCH-of5 <br />FINDINGS AND DECISION <br />OF THE HEARING EXAMINER OF THE <br />CITY OF EVERETT <br />IN THE MATTER OF THE APPLICATION <br />OF SNOHOMISH COUNTY FOR <br />APPROVAL OF A SPECIAL PROPERTY <br />USE PERMIT <br />j�E 10- E[iVC-N <br />I.1AR 222011 9 <br />KDN,PS <br />ARCHITECTS AND ENGINEERS <br />SPU #10-007 <br />SUMMARY OF DECISION: A Special Property Use Permit for the <br />relocation of an Emergency Operations <br />Center for Snohomish County is granted. <br />The facility would be at 720 - 80fh Street <br />SW, Everett, Washington. The approval <br />is granted subject to conditions ac set <br />forth herein. <br />INTRODUCTION <br />Snohomish County (Applicant), a municipal corporation of the State of Washington, <br />requested approval of a Special Property Use Permit (SPU) for the relocation of an <br />Emergency Operations Center (EOC) for the County. The project, which would occur at <br />720 - 80th Street SW, Everett, Washington (subject property), includes construction of a <br />150-toot steel lattice -type communications tower, along with supporting equipment, <br />cabling and other tenant improvements. <br />A hearing was held before the Hearing Examiner of the City of Everett on March 17, <br />2011. Al the hearing the following presented testimony and evidence: <br />Dave Tyler, City of Everett Planning Department <br />Doug Diel, CDW Architects <br />10202 - 5th Avenue N.E. <br />Seattle, WA 98125 <br />Brian Schroeder, COW Architects <br />10202 - 5th Avenue N.E. <br />Seattle, WA 98125 <br />At the hearing the following exhibits were submitted and were admitted as part of the <br />official record of these proceedings: <br />1. Staff Report <br />2. Vicinity Map <br />