My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
832 80TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
832
>
BASE FILE
>
832 80TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 8:59:18 AM
Creation date
4/19/2017 12:41:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
832
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/07/2006 12.33 FAX 425294It5 <br />June 7, 2006 <br />ES-0064 <br />Sound Ventures <br />320 1061h Avenue Northeast, Suite 100 <br />Bellevue, Washington 98004 <br />Attention: Mr. Doug Klappenbach <br />IV 9002/003 <br />It <br />Larfh <br />'Solutions <br />NW... <br />Earth Solutions NW LLC <br />Subject: Final Report <br />Construction Monitoring and Consulting Services <br />Bill" Street Venture — Buildings A, B and C <br />8XX 801h Street Southwest <br />Everett, Washington <br />Reference: Geotech Consultants, Inc. <br />Geotechnical Engineering Study <br />Dated September, 2004 <br />Dear Mr. Klappenbach: <br />• Coilvdinir.il Fnglnrnring <br />• Construalon Mnnitnrin6 <br />• Envimnnxminl St ".n, i* <br />In accordance with your request, Earth Solutions NW (E 3NW) provided construction monitoring <br />and consulting services at the subject site. We r:viewed the referenced geotechnical <br />engineering study for the project. Our services included providing onsite observations and <br />testing on a part -lime and full-time basis from Aunuit 4, 2005 to May 5, 200e. ESNW <br />representatives made sixty-two (62) site visits to observe or test building foundation subgrade, <br />building slab subgrade, utility trench backfill, vault suocc rade and rackfill, pavement subgraoo <br />and sidewalk subgrade. <br />ESNW representatives conducted ninety-six (96) fielo c erlsity tests in accordance with ASTM <br />Test Designation D2922 (Nuclear Gauge Method). Mine representative soil samples were <br />returned to our laboratory for analysis of the maxin7um dry den3ily and optimum moisture <br />content in accordance with ASTM D1557-02 (Modified Proctor). Density test results Indicate <br />adequate compaction of at least a 90 percent average a. the tested locations of the building <br />foundation and slab subgrade, utility trench backfill, and vault backfill. <br />ESNW representatives observed and tested building t3undation eubgrade to be in a dense <br />condition and sultable for the allowable soil bearing cap, city of 3,000 psf. <br />[SNW representatives observed the final pavement s 1b3rade and sidewalk subgrade to be <br />stable and unyielding. <br />2881 152nd Avenue NE • Redmond, WA 98052 •(425) 284•330� • 'As 14251 284-2,155 • Toll Free (86h) 13h•11710 <br />I/L <br />
The URL can be used to link to this page
Your browser does not support the video tag.