My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
832 80TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
832
>
BASE FILE
>
832 80TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 8:59:18 AM
Creation date
4/19/2017 12:41:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
832
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work AcLivity Work Order <br />Issued By CAG CRUM,GERRY <br />Issued Department <br />Dale Issued 1212012004 <br />Fund 401 Accounts Program 710 Function 119 <br />Program <br />Tille TAP 8INCH 832 80TH ST SW (FAST) 710119673 <br />Page 3 <br />6/7/2006 8:16 <br />Activity 673 <br />Work Order NO <br />20041057 Project <br />Activity Type CORRECTIVE MAINTENANCE <br />Date <br />12/20/2004 Time : Original <br />WO 20041056 Billing <br />Vehicle Costs <br />Type <br />Vehicle No <br />Description <br />Hours Cost Billing Date Billing Code <br />V <br />J0021 <br />1996 FORD DUMP 10 YARD <br />4 92 0111312006 <br />V <br />H0009 <br />1997 CAT BACKHOE <br />4 106 0111312006 <br />V <br />JD039 <br />1999 FORD 1 12 TON SVC TRUCK <br />4 37.2 01/132006 <br />V <br />J0049 <br />2000 FORD 1 12 TON SERVICE TR <br />4 38 01I132006 <br />Type Maier No <br />Total Vehicle Cost $27320 <br />Status CL <br />Material Costs <br />Description Quantity Cost Billing Date Billing G <br />M <br />BOXODO043347 <br />BOX VALVE 18 TOP 24 BOTTOM AND LID CAST IRON 1 <br />33.15 <br />0311012005 <br />M <br />CONC00061338 <br />CONCRETE MIX 60 I.B. BAG CEMENT, SAND AND ROCK MIX 3 <br />6.474 <br />031102005 <br />M <br />MEGA42044547 <br />MEGALUG 4 KIT <br />1 <br />14.143 <br />03I10I2D05 <br />M <br />SLEE46086647 <br />SLEEVE TAP 8 W/4 FLG TAP STAINLESS 8.62.9.06 <br />1 <br />297.428 <br />031102D05 <br />M <br />VALV42036448 <br />VALVE GATE 4 MJ X FLG WIOP NUT <br />1 <br />230.93 <br />03I10I2D05 <br />M <br />BOXOOD043547 <br />BOX VALVE 181 OP AND LID CAST IRON <br />1 <br />20,542 <br />10/172005 <br />M <br />BOX000043647 <br />BOX VALVE 24 BOTTOM CAST IRON <br />1 <br />13.701 <br />10/17/2005 <br />M <br />BOXOD0044747 <br />BOX VALVE PLASTIC BOTTOM ONLY HANDLEY <br />1 <br />15.69 <br />10/172005 <br />M <br />CONCDO061338 <br />CONCRETE MIX 60 LB. BA.3 CEMENT, SAND AND ROCK MIX 4 <br />9.132 <br />101172005 <br />M <br />MEGA46044347 <br />MEGALUG 8 KIT <br />1 <br />34.245 <br />10/172005 <br />M <br />SLEE50061947 <br />SLEEVE TAP 12 W18 FLG TAP STAINLESS 12.90.13.30 <br />1 <br />373.075 <br />101172005 <br />M <br />VALV46043048 <br />VALVE GATE 8 MJ X FLG DI W10P NUT <br />1 <br />497.934 <br />1:/172005 <br />M <br />COUP46047147 <br />COUPLING 8 MJ X 8 MJ DI SLEEVE <br />2 <br />153.374 <br />otm2o9e <br />M <br />PIPE46093847 <br />PIPE 8 TYTON JOINT Cl <br />a <br />, 56 <br />01117200C <br />M <br />PIPc46055047 <br />PIPE 6 TYTON JOINT DI CLASS 52 <br />a <br />100 3G6 <br />Otll7nnna <br />M <br />PIPE46093847 <br />PIPE 8 TYTON JOINT CI <br />-8 <br />Total Material Cost <br />51,800.48 <br />NA Costs <br />aGf� <br />Type <br />Na No <br />Description Quantity <br />Cost <br />Billing Date <br />Billing Code <br />NA <br />N/A <br />4 IN FLANGE KIT 1 <br />5.25 <br />0311012005 <br />NA <br />N/A <br />TAP FEE 1 <br />150 <br />03/102005 <br />NA <br />WA <br />8 FLG KIT 1 <br />9.34 <br />101172005 <br />NA <br />NIA <br />TAP FEE 1 <br />150 <br />10/172005 <br />NA <br />NIA <br />1.1/4 MINUS ROCK 10 <br />130 <br />011172006 <br />NA <br />NIA <br />8 MJ KIT 4 <br />64 <br />011172006 <br />Total NA Cost <br />$508.59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.