My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
834 80TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
834
>
BASE FILE
>
834 80TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 9:10:44 AM
Creation date
4/19/2017 12:43:34 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
834
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DE <br />Utilities Division, 3200 Cedar Cedar Street <br />4ar reet <br />Everett WA 98201 <br />425.257-8800 <br />Receipt # <br />Cost of Work Order <br />Cost of Service Order <br />Contact Person <br />427.00 <br />Date Paid 1� /yf -07_ <br />Work Order# <br />Service Order # (�/) -1/Qli--5 <br />Telephone # (206) 223.9500 <br />Requested By Gordon Witcher Date of Request 6.21.04 <br />Property Owner (name) Sound Ventures <br />Charge Cost to (name if different than owner) <br />Address 3201061h Ave NE <br />city Bellevue lip 98004 <br />Installation Location 830 80th St SW <br />Installation type/description/size/etc. #3 — So — 8" Fire Service. Install detect meter on contractor <br />Installed DCDA inside Bldg #A. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />"Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />229.00 <br />140.00 <br />50.00 <br />8.00 <br />427.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Matt Welborn <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Prepared by: Gerr rum �-,Date Estimate Prepared 6.22-004 <br />Accepted by: Representing/� Lrl�li� LGL <br />i <br />ESTIMATE GOOD FOR 6 MONTHS�/c <br />5.`�Canmantknnl CurmJi0lUb,h M. NE)00(: _,i_Ut _5_ c <br />
The URL can be used to link to this page
Your browser does not support the video tag.