My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
834 80TH ST SW BASE FILE 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
834
>
BASE FILE
>
834 80TH ST SW BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 9:10:44 AM
Creation date
4/19/2017 12:43:34 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
834
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OG/e7/2000 12 31 FAX 4252842° , RD002/003 <br />,Juno 7, 2006 <br />ES-0064 <br />Sound Ventures <br />320 1061h Avenue Northeast, Suite 100 <br />Bellevue, Washington 98004 <br />Attention: Mr. Doug Klapponbach <br />Larch <br />Solutions <br />Fartil Solutions NW LLC <br />Subject: Final Report <br />Construction Monitoring and Consulting Eorvicos <br />80ih Street Venture — Buildings A, B and C <br />8XX 801h Street Southwest <br />Everett, Washington <br />Reference: Geotech Consultants, Inc. <br />Geolechnical Fngineering Study <br />Dated September, 2004 <br />Dear Mr. Klappenbach: <br />• Grorer hnir ..1 Fnl;invering <br />' Construction Mnnlrnrin8 <br />• Envin,nmenl.J S, irn.,w <br />In accordance with your request, Earth Solutions NW IF ;NW) provided construction monitoring <br />and consulting services at the subject site. We r:wewed the referenced geotochnical <br />engineering study for the project. Our services included providing onsite observations and <br />testing on a part -tinge and full-time basis from August 4, 2005 to May 5, 2006. ESNW <br />repieserilatives made sixty-two (62) site visits to observ3 or test building foundation subgrade, <br />building slab subgrade, utility trench backfill, vault subc rade and backfill, pavement subgrade <br />and sidewalk subgrade. <br />ESNW representatives conducted ninety-six (96) field Tensity tests in accordance with AS7M <br />lest Designation D2922 (Nuclear Gauge Method). Nine representative soil samples were <br />returned to our laboratory for analysis of the maximum dry density and optlmum moisture <br />content in accordance with ASTM D1557-02 (Modified Proctor) Density test results indicate <br />adequate compaction of at least a 90 percent average a'. the tested locations of the building <br />foundation and slab subgrade, utility trench backfill, and vault backfill. <br />ESNW representatives observed and tested building foundation subgrade to bo in a dense <br />condition and suitable for the allowable soil bearing cap, city of 3,000 psf. <br />I_SNW representatives observed the final pavement slbgrade and sidewalk subgrade to be <br />stable and unyielding <br />2881 152nd Avenue NE -Red rn on d, WA 98052 • 1425) 284.3300 • =At (425) 184.2,155 • Toll Free 18h6) 136.8710 <br />
The URL can be used to link to this page
Your browser does not support the video tag.