Laserfiche WebLink
Date c ,, <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Applicant <br />v <br />Public Worka 1 • g3 2 2- <br />Bldg Dept. <br />Publm Works Fn <br />Total Fee f{ <br />Late Appl Fee Paid i <br />Balance Due <br />(J517Jd <br />-70 Y �s3 - Gaa s <br />Zio Phone <br />Mailing Address City Zip Phone <br />Describe Proposed Work _ / 0 <br />�L <br />Project Address (If known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicPhle: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • ! idicete North <br />proposed structures on the lot • Show any proposed grading Lhanges <br />• Existing and proposed utilities • Show measurement, <br />PERMIT CONDITIONS <br />1. All calls for Inspection shalt be made 24 hrs In advance - phone 259.8815, <br />2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications <br />3. Call Location Underground Service 48 fire. before you dig. TOLL FREE NUMBER 1.800-424.5555. <br />Uj <br />/rrstra <br />r <br />O <br />O <br />a <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs <br />expenses, or causes of action that may arise because of Installation <br />and maintenance of the Improvement or other right-of-way use hereto <br />for Construction aPP o d further agrees to remove same upon notice from the <br />Date y andto r71place public property damaged thereby. <br />""" Date _ <br />Approved se Constructed SI velure of Applicant ate <br />WPverptt PUBLIC WORKS DEPARTMENT WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />3200 Cedar Street 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTE IS TO <br />Everett, WA 98201 BE DILIGENTLY PURSUED TO COMPLETION. THIS PERM T M Y BE <br />Phone: 269-8815 CANCELLED BY THE CITY UPON ANY STOPPAGE OFWORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. J <br />