My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
114 81ST ST SW 2018-01-02 MF Import
>
Address Records
>
81ST ST SW
>
114
>
114 81ST ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 10:46:12 AM
Creation date
4/19/2017 12:56:32 AM
Metadata
Fields
Template:
Address Document
Street Name
81ST ST SW
Street Number
114
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-je rITY AF p awrr <br />8U/L 91 ills DINA051M <br />.3200 CEVAR St EiV&vrrP W-4 000P* (,"fl 159-8E/O <br />The Chapter 6 Approach This compilance method allows any combination of building envolope <br />components If their collective heatloss (R and U-values) doesn't exceed a maximum WSEC budget. The <br />Chapter 5 approach is a good choice for additions that don't eohlorrd to any of the Chapter 6 pathways. This Is <br />true because Chapter allows Component Performance calculations to include heat loss improvements in the <br />itxtstino providesme. The a variety Of compl ter 6, anceioptionive sp sach easierttonuse, and Is nofirst <br />mo a stringent than chapter since <br />5. <br />Component Performance calculations may also be pedd?med by computer using programs such as WATTSUM <br />5.1. <br />instructions., <br />Pages 1, 213 The first two pages provide Instructions and forms lot performing the Component Performance <br />calculations. The third page sizes the heating system. <br />Pages 4 to s In the shaded areas, make checks In the circles next to the requirements of your Intended <br />meore el11olern�yif you provide all tonents or he Irequestedment that <br />inlormetloln. td parlme t sttaaff can help you it will <br />ubwl processed general <br />questions about this form. <br />This form Is Intended to educate and provide enforcement consistbncy between inspectors and building <br />)urlsdlctlons. Instead of searching through the WSEC, this form will help organize and condense the <br />requirements that apply to yourpro)ect. Requirements are grouped by foundation, framing, Insulafbn, and final <br />Inspectlon phases. <br />Responsiblllty for Information: /I Is ultimately Your responsibility to provide detailed Information about heating <br />systems, glazing, insulation, and other building specifications. RB sure to get prior approval from the <br />Department It you make changes that deviate lydm the completed 16rm. For more code detail, refer to the <br />Washington State Energy Code, 1991 Edition. <br />Compliance responsibility: This form will ultimately be used for all WSEC field 111spectlons. When It Is returned <br />with your permit, note all boxes that have been checked undef Ilia "COMPLIANCE nEOUIRED"column. These <br />boxes denote which requirements the Ins0ctot will check at each Inspection phase. He will Inspect and <br />approve each of these checked Items by placing a second check In the 1. "INSPECTION APPROVED"column. <br />All residential Occupancies <br />OTHER heat source (Gas, ollt propane, wood, heat pumps) <br />WEESIeOWMAN/OCTOGER 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.