Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT 1 POSTING <br />City of Everett Total Utility Maintenance Management System <br />06/01/1993 Page 1 <br />Date Range :11/09/1900 - 06/01/1993 <br />CM Work Order Range :0810800810001 - 8405421080229Pattern :7101236730077 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101236730077 Title: INSTALL 1110 84TH ST SE <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 123 Activity 673 <br />Date Completed: 06/01/1'�93 <br />Overall Craft: <br />Issued: 05/21/1993 Issued by: HDA Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Planned Hours <br />Actual Hours <br />Cost <br />Craft ID <br />Name <br />----------- <br />---- <br />----- ------ <br />SUP2 HDA <br />------------------------------ <br />HALL, DONALD A. <br />- <br />0.00 <br />0.00 <br />4.00 <br />13.00 <br />83.24 <br />104.00 <br />DL KKM <br />KARELS, KEVIN ML. <br />0.00 <br />13.00 <br />163.67 <br />UL LRR <br />LARSON, RICHARD R. <br />0.00 <br />8.00 <br />91.44 <br />UL NCR <br />NIETHAMER, CHARLES R. <br />0.00 <br />2.00 <br />36.12 <br />HEO SDD <br />STECHER, DANIEL D. <br />0.00 <br />13.00 <br />213.46 <br />EO SR <br />SIERRA, RAMON (NMI) <br />0.00 <br />2.00 <br />16.00 <br />DL WJG <br />WETZSTEIN, JEFF G. <br />Number <br />Materials: <br />ID <br />Description <br />Date <br />-------- <br />Used <br />------ ----- <br />Cost� <br />_ _ ________ <br />CEME00061438 <br />------------------------------ <br />CEMENT 20 MIN. SET 50 LB. BAG u5/21/1993 <br />2 <br />\ 19.54 <br />Vehicles: <br />Description <br />Date <br />Hours <br />Cost <br />ID <br />-------- <br />------ ---- <br />------------ <br />V2047 <br />------------------------------ <br />PICKUP GMC S15 89 <br />05/21/1993 <br />4.00 <br />5.00 <br />19.20 <br />26.00 <br />V2133 <br />SVC TRUCK DODGE 84 <br />'90 <br />05/24/1993 <br />05/21/1993 <br />8.00 <br />212.80 <br />V2230 <br />FORD 5 YD DUMP <br />'90 <br />05/24/1993 <br />5.00 <br />133.00 <br />V2230 <br />FORD 5 YD DUMP <br />BACKHOE/LOADER CASE 4X4 <br />88 05/21/1993 <br />8.00 <br />177.60 <br />V3507 <br />V3507 <br />BACKHOE/LOADER CASE 4X4 <br />88 05/24/1993 <br />5.00 <br />111.00 <br />90.00 <br />VH0002 <br />1993 VACTOR <br />05/21/1993 <br />2.00 <br />Total cost <br />for work order 7101236730077: <br />-------------- <br />1497.07 <br />